Construction Scheduling Consultants, Australia-wide

Independent construction scheduling, programme review and delay analysis for construction, infrastructure, mining and heavy industrial projects in Australia's capital cities and regional areas.

Project Scheduling provides independent construction scheduling across Australia. We are construction scheduling consultants who build, resource and defend the programme itself, in Oracle Primavera P6, so it can be interrogated in delivery, audit and dispute. Whether engaged as an independent advisor or working alongside your delivery team, we take responsibility for the programme and the evidence behind it, on construction, infrastructure, mining and heavy industrial projects nationwide.

What construction scheduling covers

A construction programme is only as good as the thinking underneath it. A clean-looking bar chart can still be wrong: the logic may be propped up by constraints, the apparent critical path may not reflect the work driving completion, or the durations may assume productivity the site cannot achieve. We start with how the project team intends to build the work, then develop a programme they can recognise, test and use.

That means:

  • Methodology and sequencing first. We work through staging, access, construction sequence and handovers with the project manager, superintendent and relevant discipline leads. The team reviews and affirms that the programme reflects the agreed approach; assumptions that remain unresolved are recorded, not buried in the dates.

  • A logic-linked programme in Primavera P6. Activities and relationships reflect the work to be done. We check open ends, justify constraints and lags, and trace the path driving completion rather than accepting whichever activities the software colours red.

  • Calendars and durations grounded in the job. Shifts, access windows, weather allowances and holidays are reflected in the plan. Key durations are tested against quantities, production rates and the resources available, not guessed to fit a target finish date.

  • Resources tested against the construction sequence. We examine whether labour, plant and workfaces can support the proposed plan. Where the engagement requires it, we resource- and cost-load the programme and examine the effect of resource limits on the dates, rather than assuming that loading alone makes the plan deliverable. Primavera P6's levelling settings can alter activity dates, so those effects need to be understood, not accepted blindly.

  • Interfaces built into the logic. Procurement and long-lead items, design release, approvals and authority decisions, and handovers between contractors and disciplines are scheduled as part of the work. If a decision or delivery can determine completion, it should not sit outside the programme as an undocumented assumption.

  • Progress measured against what actually happened. We maintain the programme using verified progress and project records, examine changes to the critical and near-critical paths, and explain emerging delay while there is still time to respond. Schedule risk analysis and schedule-quality checks support that judgement; they do not replace it.

This is how we develop tender and baseline programmes that the delivery team can stand behind. The same construction understanding informs project controls and programme review before a programme is committed or submitted, and forensic delay analysis and extension of time claims if its assumptions and the subsequent record are later put under scrutiny.

A programme built this way stands on more than the planner's word: the people responsible for delivering the work have tested and affirmed the plan it represents. That team affirmation is distinct from a client's or contract administrator's formal acceptance of the programme.

What you get

A logic-linked P6 programme with documented assumptions and interfaces; a resource or progress basis where the engagement requires it; and, on a review, a clear read of your critical-path and completion-date exposure. Evidence you can act on, not a file you cannot interrogate.

Construction scheduling across Australia

Sydney and NSW

Sydney Desalination Plant, Kurnell - critical-path construction scheduling

We developed and maintained the critical-path schedule for the main contractor on the Sydney Desalination Plant, and led planning for structural steel design and supply on the Sydney International Convention Centre at Darling Harbour. Sydney programmes run across live urban corridors under immovable public deadlines, where staging and the interface with operating precincts drive the finish date as much as the build.

Brisbane and Queensland

Our Queensland experience runs across bulk materials handling and transport, including coal rail and sea loading, sugar refineries and their transport, and bauxite mining and processing; process and heavy industrial work including ammonium nitrate production; and quarrying at Ormeau. On this work the critical path runs through access, materials handling and commissioning, not just the build. We support Brisbane-based delivery teams and regional Queensland sites.

Canberra

Canberra Light Rail to Woden - infrastructure scheduling engagement

We delivered an 18-month scheduling engagement on Canberra Light Rail to Woden, the ACT's largest infrastructure investment, and hold a position on the Infrastructure Canberra Specialist Advisors Panel. For a project scheduler in Canberra, or a construction programme anywhere in the ACT, that is direct experience of the territory's largest programme, with an independent and senior perspective.

Melbourne and Victoria

civil construction site - construction programme scheduling

Our Victorian experience includes the Boral plasterboard factory upgrade, Deer Park Quarry and a landfill gas-to-energy plant, across manufacturing, quarrying and energy. We support Melbourne construction, civil and industrial programmes where staging and interfaces decide the finish date more than the activities on the bar chart.

Adelaide and South Australia

Our South Australian experience includes the Whyalla Blast Furnace No. 2 reline and copper and uranium mining and processing work. That same discipline, programme integrity under audit and dispute, applies to an Adelaide building, infrastructure or industrial programme, whether you need it built, reviewed or defended.

Perth and Western Australia

Roadworks and civil construction, Western Australia - Primavera P6 scheduling

Our Western Australian experience covers quarrying, minerals processing, and roads and bridges for transport infrastructure. For a Perth-based team managing a remote WA project, we build and defend the programme in Primavera P6, from tender through execution, with the interface and commissioning focus these operations demand.

Evidence, not assertion

On one $59M earthworks programme three months from dispute, the cause was not the contractor: it was the client's own approval and RFI processes, adding 28 days to every critical decision. We traced 215 approval transactions to prove the baseline was unachievable from day one. The outcome was a six-month extension of time and the dispute avoided. Over twenty years, independent and senior, across Australia. Explore our forensic delay analysis.

Frequently asked questions

Do you provide construction scheduling outside the capital cities?

Yes. We work Australia-wide, remotely and on site as the project needs, including regional and remote operations.

What does a construction scheduling consultant do?

We build, resource and maintain the project programme, analyse the critical path and schedule risk, and, when a project runs late, establish what caused the delay and substantiate the extension of time claim on the record.

Which scheduling software do you use?

We primarily use Oracle Primavera P6 for programme development and analysis, and we agree the programme format and reporting requirements with the client at the start of the engagement.

Can you help if our project is already in dispute?

Yes. We provide independent forensic delay analysis and extension of time claim support, built on the contemporaneous record.

Are you a construction scheduling company or an independent consultant?

We are an independent construction scheduling consultancy. You work directly with a senior scheduler who owns your programme, with the depth of a specialist firm behind it, rather than a junior handed the file inside a larger company.

Discuss your construction programme
Whether you are building the baseline or defending the delay, you get evidence you can act on.